
“The unified remote administration of Larisa, which controlled the section from Domoko to Platis, gradually began to decline and falter from 2015 until it completely collapsed in subsequent years. Meanwhile, during this entire period, it was impossible to reassign and maintain him so that he could function again,” the statement said. operating environmentresponding to SYRIZA President Alexis Tsipras on his visit to Larissa.
“In the middle of 2019, with the restart of the stopped Contract 717, all work began on the fundamental reduction and commissioning of local remote administrations from Paleofarsalos to Plati, so that subsequently all of them (15 in this section) could be interconnected into a single display and management, which will constitute a single control panel on the section from Domoko to Plata,” the EfE notes.
The announcement continues as follows:
“In the context of the gradual reduction and commissioning of local remote administrations, already from November 2022, 7 local remote administrations (Paleofarsalu, Dohar, Orfana, Kranon, Mezurlu and Larisa) have been transferred with VAT and are operating, while the reduction of the rest continues.
In particular, the local control panel of the Larisa station, which was not visited by the official leader of the opposition, is officially certified and has all the relevant official documents confirming its existence, as well as normal and uninterrupted operation since November 2022.
After that, the official leader of the opposition saw the local remote control on TX1, while he did not visit the remote control center in Thessaloniki, where the remote control Vardia would officially inform him, thus gaining a personal understanding of whether the remote control in Thessaloniki exists and is operating. .
This console was put into operation in 2021, it extends from the SS PLATIA – TX1 – TX5 and from the SS 1-PS STRIMONA, the routes are drawn, the train movement is displayed with a train signal indication, and it has also received an ETCS operation certificate.
Finally, at this point, it should be mentioned that the TX1 local remote control center had problems in operation due to outdated equipment and a lack of available spare parts. To solve them, ERGOSE is already implementing Convention 713, which provides for its downgrade and modernization.”
⇒ News today
Subscribe to kathimerini.gr on Google News and be the first to know all the news
See all the latest news from Greece and the world at kathimerini.gr
Source: Kathimerini

Ashley Bailey is a talented author and journalist known for her writing on trending topics. Currently working at 247 news reel, she brings readers fresh perspectives on current issues. With her well-researched and thought-provoking articles, she captures the zeitgeist and stays ahead of the latest trends. Ashley’s writing is a must-read for anyone interested in staying up-to-date with the latest developments.